The main activity currently going on is drywalling…four of the guys worked on Saturday hanging drywall on the main floor while their tape/mud colleagues applied the second coat in the basement.

On the outside – Erich and Javier further prepared for stucco by installing the mesh on the two dormer windows and under the soffit/fascia adjacent to the loggia chimney.

Also – the masons on Friday installed more brick in the loggia and cinder block on the exterior reading room walls.  The outside is dangerously close to being completed!

 

IMG_1898

Cinder block installed on reading room

 

IMG_1895

Anne testing the rear stoop

IMG_1903

Prepping the loggia stucco near chimney

IMG_1894

Taped and mudded basement

IMG_1901

Kitchen skylight … with drywall

IMG_1907

Dining room / Stairwell / Arch to Bazaar

IMG_1912

Faux windows in loggia

  