Back from Napa…Time Stands Still

November 10, 2014

Home Construction

When we’re in Napa…we love how time just seems to stand still.  We didn’t expect progress on the house to follow suit.

Sure, there were pockets of activity but nothing major to speak of during the two days we were in wine country.

The gutters were finished, the first row of the driveway retaining wall was laid, another layer of stucco and the arch in the bazaar were added, some shower tiles were installed and case molding for the windows/doors was delivered.

Perhaps the biggest development was that the first flight of stairs was installed…connecting the basement to the lower landing.

IMG_2190

Update front view…stucco (wrong color?) done

IMG_2191

From the south

IMG_2206

From the north

IMG_2199

Bazaar ceiling

IMG_2195

Staircase…some assembly required

IMG_2194

Stairs out of the basement

IMG_2193

Jim tiling the master shower

IMG_2201

Footing of driveway retaining wall

IMG_2203

Site of future walkway