After eight long months of walking on the dusty gravel to enter to the house – we’re very happy now to have a driveway.  Almost as soon as the driveway pavers left the landscapers brought up their Bobcat and starting excavating the ground for what will be the pathway to the front door.  Yes, somewhere behind that piece of pine plywood is our front door.

The landscapers also began installing the stone surface on the front porch.

On the inside, the third flight of stairs was installed – taking us up from the Great Room to the landing/gallery.  Mike continued installing the case trim around the windows and Jim/John worked on Hannah’s shower and bathroom after they installed the stone floor in the master shower.

We also today had visits from the Generac contractor and the wallpaper guy.

With all this activity today Anne had her hope restored that we’ll actually one day live in this house!

IMG_2220

(BEFORE) Lining up the paver

IMG_2222

(AFTER) We have a blacktop driveway

IMG_2223

Tim installing the stringers

IMG_2228

Stairs to the Gallery

IMG_2213

Stairs to the basement

IMG_2232

Bluestone risers on porch

IMG_2230

Laying out the pathway to the front porch

IMG_2224

Case trim in the Reading Room

IMG_2212

Wood planks installed on the catwalk

IMG_2219

Black & pebbly Master Shower

JHB's avatar

Subscribe

Subscribe to our RSS feed and social profiles to receive updates.

No comments yet.

Leave a comment